Free practice test
Practice for the OSHA 30-hour construction course and the test a trainer may give at its end: scaffolds, trenching, ladders, cranes, confined spaces and the rest of the course. Pick an answer to see whether it is right and the OSHA standard behind it.
Foremen, leads and supervisors are often asked for an OSHA 30 card, the longer course for people who run work on site.
Pick an answer to see whether it is right. Each explanation shows why, with the rule or the working behind it, so a wrong answer still teaches you something.
Scaffolds (4) · Excavations and trenching (4) · Stairways and ladders (4) · Cranes, derricks and rigging (4) · Concrete and masonry (4) · Steel erection (4) · Confined spaces (4) · Fire protection and prevention (4) · Hazard communication (4) · Managing safety and health (4)
Scaffold capacity, fall protection, access and inspection (29 CFR 1926 Subpart L).
1. Each scaffold and scaffold component must support, without failure, its own weight and at least how many times the maximum intended load?
B. 4 times. 29 CFR 1926.451(a)(1) requires each scaffold and scaffold component to support its own weight and at least 4 times the maximum intended load applied or transmitted to it, apart from the listed exceptions such as suspension rope.
From 29 CFR 1926.451(a)(1)
2. Above what height must each employee on a scaffold be protected from falling to a lower level?
C. More than 10 feet. 29 CFR 1926.451(g)(1) requires fall protection for each employee on a scaffold more than 10 feet above a lower level. The type depends on the scaffold, for example both a personal fall arrest system and a guardrail system on single-point or two-point adjustable suspension scaffolds.
From 29 CFR 1926.451(g)(1)
3. A supported scaffold platform is more than 2 feet above the point of access. Which of these is barred as a way to climb to it?
D. The scaffold's cross braces. 29 CFR 1926.451(e)(1) requires a ladder, stair tower, ramp, walkway, integral prefabricated access or similar means when a platform is more than 2 feet above or below a point of access, and states that crossbraces shall not be used as a means of access.
From 29 CFR 1926.451(e)(1)
4. When must scaffolds and scaffold components be inspected for visible defects, and by whom?
A. By a competent person before each work shift and after any occurrence that could affect structural integrity. 29 CFR 1926.451(f)(3) requires a competent person to inspect scaffolds and components for visible defects before each work shift and after any occurrence that could affect the scaffold's structural integrity.
From 29 CFR 1926.451(f)(3)
Soil classification, sloping and when an engineer must design the protective system (29 CFR 1926 Subpart P).
5. Under Appendix A to Subpart P, Type A soil is cohesive soil with an unconfined compressive strength of at least:
C. 1.5 tons per square foot. Appendix A defines Type A as cohesive soil with an unconfined compressive strength of 1.5 tons per square foot (tsf) or greater. Type B cohesive soil is greater than 0.5 but less than 1.5 tsf, and Type C cohesive soil is 0.5 tsf or less.
From 29 CFR 1926 Subpart P, Appendix A (b), Definitions
6. A clay soil tests at 2.0 tons per square foot unconfined compressive strength, but it is subject to vibration from heavy traffic next to the trench. How must it be classified?
A. Type B. Appendix A says no soil is Type A if it is subject to vibration from heavy traffic, pile driving or similar effects, and its Type B definition includes soil that meets the Type A strength or cementation requirements but is fissured or subject to vibration.
From 29 CFR 1926 Subpart P, Appendix A (b), Type A and Type B
7. A 12-foot-deep excavation in Type C soil is protected by a simple slope under Appendix B. What is the maximum allowable slope (horizontal to vertical)?
D. 1 1/2 to 1. Appendix B, Figure B-1.3, gives a maximum allowable slope of 1 1/2 horizontal to 1 vertical for simple slope excavations 20 feet or less deep in Type C soil. This is also the slope Option (1) of 1926.652(b)(1) allows (34 degrees from horizontal). In Figure B-1, Type A allows 3/4 to 1 and Type B allows 1 to 1.
From 29 CFR 1926 Subpart P, Appendix B, Figure B-1
8. An excavation will be 24 feet deep. Who must design the protective system?
B. A registered professional engineer. Appendix F to Subpart P states that protective systems for excavations more than 20 feet deep must be designed by a registered professional engineer under 1926.652(b) and (c). The Appendix B slopes and the Appendix C and D shoring tables cover excavations of 20 feet or less.
From 29 CFR 1926 Subpart P, Appendix F, and 1926.652(b) and (c)
When stairs or ladders are required and how portable ladders are set up and used (29 CFR 1926 Subpart X).
9. A stairway or ladder must be provided at a personnel point of access with no ramp, runway, sloped embankment or personnel hoist when the break in elevation is at least:
B. 19 inches. 29 CFR 1926.1051(a) requires a stairway or ladder at all personnel points of access where there is a break in elevation of 19 inches or more and no ramp, runway, sloped embankment or personnel hoist is provided.
From 29 CFR 1926.1051(a)
10. A portable ladder is used to reach a roof. How far must its side rails extend above the upper landing surface?
C. At least 3 feet. 29 CFR 1926.1053(b)(1) requires the side rails to extend at least 3 feet above the upper landing. If the ladder is too short for that, it must be secured at the top to a rigid support that will not deflect, with a grasping device such as a grabrail.
From 29 CFR 1926.1053(b)(1)
11. An extension ladder has a working length of 20 feet from its foot to its top support. About how far should the foot be from the top support, measured horizontally?
A. 5 feet. 29 CFR 1926.1053(b)(5)(i) sets the angle of a non-self-supporting ladder so the horizontal distance from the top support to the foot is about one-quarter of the working length. One-quarter of 20 feet is 5 feet (20 / 4 = 5).
From 29 CFR 1926.1053(b)(5)(i)
12. A ladder will be used where the worker or the ladder could contact exposed energized electrical equipment. What does 29 CFR 1926.1053 require?
C. A ladder with nonconductive side rails. 29 CFR 1926.1053(b)(12) requires ladders to have nonconductive side rails when they are used where the employee or the ladder could contact exposed energized electrical equipment, apart from the exceptions in 1926.955.
From 29 CFR 1926.1053(b)(12)
Power line clearance, crane inspections and working in the fall zone (29 CFR 1926 Subpart CC).
13. Before crane operations begin, the employer must take the power line precautions of 29 CFR 1926.1408 if any part of the crane, load line or load could get closer than what distance to a power line rated up to 350 kV?
C. 20 feet. 29 CFR 1926.1408(a)(2) requires the employer to determine whether any part of the equipment, load line or load, operated up to its maximum working radius, could get closer than 20 feet to a power line. If so, the employer must deenergize and ground the line, keep a 20-foot clearance, or use the Table A clearance.
From 29 CFR 1926.1408(a)(2)
14. The utility confirms an overhead line is 115 kV. Using Table A of 29 CFR 1926.1408, what is the minimum clearance distance?
B. 15 feet. Table A sets 10 feet for lines up to 50 kV, 15 feet for over 50 to 200 kV, 20 feet for over 200 to 350 kV and 25 feet for over 350 to 500 kV. A 115 kV line falls in the over 50 to 200 kV row, so the minimum clearance is 15 feet.
From 29 CFR 1926.1408, Table A
15. Who must perform the visual inspection of a crane before each shift it will be used?
A. A competent person. 29 CFR 1926.1412(d)(1) requires a competent person to begin a visual inspection before each shift the equipment will be used and to complete it before or during that shift. The annual comprehensive inspection is done by a qualified person (1926.1412(f)).
From 29 CFR 1926.1412(d)(1) and (f)
16. Workers must be in the fall zone to hook and guide a load. Which condition does 29 CFR 1926.1425(c) require?
D. The materials are rigged by a qualified rigger to prevent unintentional displacement, using hooks with self-closing latches or their equivalent. When employees hook, unhook or guide a load in the fall zone, 1926.1425(c) requires the materials to be rigged to prevent unintentional displacement, hooks with self-closing latches or their equivalent (J hooks are allowed for setting wooden trusses), and rigging by a qualified rigger.
From 29 CFR 1926.1425(c)
Rebar, post-tensioning, shoring and masonry wall limited access zones (29 CFR 1926 Subpart Q).
17. A crew will build a masonry wall 12 feet high. How wide must the limited access zone be?
C. 16 feet. 29 CFR 1926.706(a)(2) sets the limited access zone equal to the height of the wall plus four feet, running the entire length of the wall: 12 + 4 = 16 feet. It goes on the unscaffolded side, and only employees actively building the wall may enter it.
From 29 CFR 1926.706(a)
18. What does 29 CFR 1926.701(b) require for protruding reinforcing steel that workers could fall onto or into?
D. It must be guarded to eliminate the hazard of impalement. 1926.701(b) requires all protruding reinforcing steel onto and into which employees could fall to be guarded to eliminate the hazard of impalement.
From 29 CFR 1926.701(b)
19. During post-tensioning operations, who may be behind the jack?
A. Only employees essential to the post-tensioning operation. 29 CFR 1926.701(c)(1) bars all employees except those essential to the post-tensioning operations from being behind the jack during tensioning.
From 29 CFR 1926.701(c)(1)
20. When must erected shoring for cast-in-place concrete be inspected?
C. Immediately before, during and immediately after concrete placement. 29 CFR 1926.703(b)(3) requires erected shoring equipment to be inspected immediately prior to, during and immediately after concrete placement. Under (b)(1), shoring is also inspected before erection against the formwork drawings.
From 29 CFR 1926.703(b)
Fall protection for ironworkers and connectors, column anchorage and multiple lifts (29 CFR 1926 Subpart R).
21. Apart from connectors and workers in a controlled decking zone, an employee doing steel erection must be protected from falls when on a surface with an unprotected side or edge more than how high above a lower level?
C. 15 feet. 29 CFR 1926.760(a)(1) requires guardrail systems, safety net systems, personal fall arrest systems, positioning device systems or fall restraint systems for steel erection workers on a walking or working surface with an unprotected side or edge more than 15 feet above a lower level. Connectors and controlled decking zone workers follow 1926.760(b) and (c).
From 29 CFR 1926.760(a)(1)
22. Connectors in steel erection must be protected by conventional fall protection from fall hazards of more than:
D. Two stories or 30 feet, whichever is less. 29 CFR 1926.760(b)(1) protects connectors from fall hazards of more than two stories or 30 feet above a lower level, whichever is less. Between 15 and 30 feet, connectors must be provided with a personal fall arrest, positioning device or fall restraint system and wear the equipment needed to tie off ((b)(3)).
From 29 CFR 1926.760(b)
23. What is the minimum number of anchor rods (anchor bolts) for each column in steel erection?
C. 4. 29 CFR 1926.755(a)(1) requires all columns to be anchored by a minimum of 4 anchor rods (anchor bolts). Each column anchor rod assembly must also resist a minimum eccentric gravity load of 300 pounds located 18 inches from the extreme outer face of the column ((a)(2)).
From 29 CFR 1926.755(a)
24. When several members are hoisted together on a multiple lift rigging assembly, what is the most members that may be hoisted per lift?
A. 5. 29 CFR 1926.753(e)(1)(ii) allows a maximum of five members per lift, and only with a multiple lift rigging assembly, trained employees and a crane used within the manufacturer's specifications. The members are set from the bottom up ((e)(5)).
From 29 CFR 1926.753(e)
Hazardous atmospheres, atmospheric testing and the attendant's role (29 CFR 1926 Subpart AA).
25. Under the construction confined spaces standard, which oxygen levels make an atmosphere hazardous?
D. Below 19.5 percent or above 23.5 percent. 29 CFR 1926.1202 lists an atmospheric oxygen concentration below 19.5 percent or above 23.5 percent as a hazardous atmosphere. Below 19.5 percent is oxygen deficient and above 23.5 percent is oxygen enriched.
From 29 CFR 1926.1202, definitions of hazardous atmosphere, oxygen deficient and oxygen enriched atmosphere
26. A flammable gas, vapor or mist creates a hazardous atmosphere in a confined space when it exceeds what share of its lower flammable limit (LFL)?
B. 10 percent. 29 CFR 1926.1202 defines a hazardous atmosphere to include flammable gas, vapor or mist in excess of 10 percent of its lower flammable limit (LFL).
From 29 CFR 1926.1202, definition of hazardous atmosphere
27. In what order must a permit space be tested for atmospheric hazards?
D. Oxygen, then combustible gases and vapors, then toxic gases and vapors. 29 CFR 1926.1204(e)(3) requires testing first for oxygen, then for combustible gases and vapors, and then for toxic gases and vapors.
From 29 CFR 1926.1204(e)(3)
28. During a permit-required confined space entry, where must the attendant be?
A. Outside the permit space until relieved by another attendant. 29 CFR 1926.1209(d) requires the attendant to remain outside the permit space during entry operations until relieved by another attendant. The attendant also keeps an accurate count of the authorized entrants in the space ((c)).
From 29 CFR 1926.1209(c) and (d)
Fire extinguishers, flammable liquid storage and compressed gas cylinders (29 CFR 1926 Subpart F and 1926.350).
29. In a building under construction, what is the maximum travel distance from any point of the protected area to the nearest 2A-rated fire extinguisher?
D. 100 feet. 29 CFR 1926.150(c)(1)(i) requires a fire extinguisher rated at least 2A for each 3,000 square feet of protected building area, or major fraction of it, and the travel distance to the nearest one may not exceed 100 feet.
From 29 CFR 1926.150(c)(1)(i)
30. Workers are using more than 5 gallons of flammable liquids on the job. What extinguisher is required, and where?
B. A 10B extinguisher within 50 feet. 29 CFR 1926.150(c)(1)(vi) requires an extinguisher rated at least 10B within 50 feet of wherever more than 5 gallons of flammable or combustible liquids, or 5 pounds of flammable gas, are being used on the job site. It does not apply to the integral fuel tanks of motor vehicles.
From 29 CFR 1926.150(c)(1)(vi)
31. How many gallons of flammable liquids may be stored in a room outside an approved storage cabinet?
B. No more than 25 gallons. 29 CFR 1926.152(b)(1) allows no more than 25 gallons of flammable liquids in a room outside an approved storage cabinet. Larger amounts go in a cabinet, which may hold no more than 60 gallons of Category 1, 2 or 3 flammable liquids or 120 gallons of Category 4 ((b)(3)).
From 29 CFR 1926.152(b)(1) and (b)(3)
32. How must oxygen cylinders in storage be separated from fuel-gas cylinders?
A. By at least 20 feet, or by a noncombustible barrier at least 5 feet high with a fire-resistance rating of at least one-half hour. 29 CFR 1926.350(a)(10) requires oxygen cylinders in storage to be separated from fuel-gas cylinders or combustible materials, especially oil or grease, by at least 20 feet or by a noncombustible barrier at least 5 feet high with a fire-resistance rating of at least one-half hour.
From 29 CFR 1926.350(a)(10)
Labels, signal words, pictograms, safety data sheets and training (29 CFR 1910.1200, applied to construction by 1926.59).
33. Under OSHA's Hazard Communication Standard, which signal word on a chemical label marks the more severe hazards?
D. Danger. 29 CFR 1910.1200(c) uses two signal words: "danger" for the more severe hazards and "warning" for the less severe. 29 CFR 1926.59 applies the same requirements to construction.
From 29 CFR 1910.1200(c), definition of signal word (applied by 29 CFR 1926.59)
34. A worker wants to know what gloves and respirator a product calls for. Which section of its safety data sheet (SDS) covers exposure controls and personal protection?
C. Section 8. 29 CFR 1910.1200(g)(2) lists the SDS sections in order: Section 8 is Exposure controls/personal protection. Section 2 is Hazard(s) identification, Section 4 is First-aid measures and Section 11 is Toxicological information.
From 29 CFR 1910.1200(g)(2)
35. What does a Hazard Communication Standard pictogram look like on a label?
B. A black hazard symbol on a white background inside a red-framed square set on its point. Appendix C, C.2.3.1, of 29 CFR 1910.1200 requires pictograms to be a square set at a point with a black hazard symbol on a white background and a red frame wide enough to be clearly visible. A red frame without a symbol is not a pictogram.
From 29 CFR 1910.1200, Appendix C, C.2.3.1
36. When must an employer give workers information and training on the hazardous chemicals in their work area?
D. At their initial assignment, and whenever a new chemical hazard they have not been trained on is brought into their work area. 29 CFR 1910.1200(h)(1) requires effective information and training at the time of initial assignment and whenever a new chemical hazard the employees have not previously been trained about is introduced into their work area. Under (g)(8), SDSs must also be readily accessible to employees in their work areas during each work shift.
From 29 CFR 1910.1200(h)(1) and (g)(8)
Competent persons, job-site inspections, unsafe equipment and injury records.
37. Under 29 CFR 1926.32, what makes someone a competent person?
B. Being able to identify existing and predictable hazards and having authorization to take prompt corrective measures to eliminate them. 1926.32(f) defines a competent person as one who can identify existing and predictable hazards that are unsanitary, hazardous or dangerous to employees and who has authorization to take prompt corrective measures to eliminate them. A qualified person (1926.32(m)) is defined instead by a recognized degree, certificate or professional standing, or by extensive knowledge, training and experience.
From 29 CFR 1926.32(f) and (m)
38. A foreman finds a power saw on site that does not comply with the OSHA construction standards. What does 29 CFR 1926.20(b)(3) require?
A. Tag it as unsafe or lock its controls so it cannot run, or physically remove it from the work area. 1926.20(b)(3) prohibits using any machinery, tool, material or equipment that does not comply with the standards: it must be identified as unsafe by tagging or locking the controls to make it inoperable, or physically removed from its place of operation. Under 1926.20(b)(2), the employer's program must include frequent and regular inspections by competent persons.
From 29 CFR 1926.20(b)(2) and (b)(3)
39. An employer that must keep OSHA injury and illness records learns that a recordable injury has occurred. How soon must it be entered on the OSHA 300 Log and 301 Incident Report?
C. Within 7 calendar days. 29 CFR 1904.29(b)(3) requires each recordable injury or illness to be entered on the OSHA 300 Log and 301 Incident Report within seven calendar days of receiving information that it occurred.
From 29 CFR 1904.29(b)(3)
40. When must the OSHA 300A annual summary be posted?
B. From February 1 to April 30 of the year after the records cover. 29 CFR 1904.32(b)(6) requires the annual summary to be posted no later than February 1 of the year after the year the records cover, and kept posted until April 30. The records themselves are kept for five years after the end of the year they cover (1904.33(a)).
From 29 CFR 1904.32(b)(6) and 1904.33(a)
More free practice tests: EPA 608 Practice Test · Journeyman Electrician Practice Test · Journeyman Plumber Practice Test · OSHA 10 Practice Test · Electrical Aptitude Test Practice · UA Plumbers and Pipefitters Aptitude Test Practice · EEI CAST Test Practice · Contractor Business and Law Practice Test · CSLB Law and Business Practice Test · Florida Business and Finance Exam Practice Test · Arizona Statutes and Rules Exam Practice Test · Nevada Business and Law Exam Practice Test · Utah Business and Law Exam Practice Test · Louisiana Business and Law Exam Practice Test · South Carolina Business and Law Exam Practice Test · North Carolina General Contractor Exam Practice Test · Oregon CCB Test Practice Test · New Mexico Business and Law Exam Practice Test · Alabama Business and Law Exam Practice Test · Hawaii Business and Law Exam Practice Test · OSHA 10 General Industry Practice Test · Forklift Practice Test
No. The bodies that give the real exam keep its questions to themselves. Each question here is written for the rules or skills the exam tests, and its explanation shows the working or names the section of the regulation or code it comes from, so you learn the rule rather than one answer.
Yes. All 40 questions and their explanations are free, with no sign-up. Your answers stay in your browser.
Checked against the rules in force on 2026-11-26. Rules and exam formats change: check the current rule and your exam provider's own information before the exam.